Bick + Letzel GmbH was contracted to complete the escape tower; this was an urgent request because without the emergency stairs it was not possible to use the building. In a very short time, the various teams at Bick + Letzel GmbH produced
the separate parts and started with the assembly work on site. The construction work at the escape tower took just three months and it was possible to inaugurate the building on time.
The company Bick + Letzel GmbH is a certified manufacturer of steel constructions in compliance with DIN EN 1090-2 EXC 4 and DIN 18800-7: 2002-09 Class E. This also includes cranes and crane tracks, large tanks, steel chimneys and bridges.
This approval also applies to constructions made of stainless steel. Large volume and thick-walled steel construction groups can also be manufactured in our production facilities. These parts can be transported easily via cargo ships from our own port on the river Main. Manufactured components can be protected from corrosion immediately and effectively in our own corrosion protection department.
Steel construction
FACTS
DIN 18800-7: 2002-09 Class E
DIN EN 1090-2 EXC 4
In-house welding engineering department
Port with 2.80 m deep navigable channel for inland navigation vessels up to 110 m in length
450 t crane
MAG and UP systems
In-house corrosion protection facility
Large quantities in a short time thanks to two-shift operation
Larges halls and systems
Armouring
Fin-grained steels
Black-white connections
5-storey stair tower with a roof exit via the parapet. Blended into the design of the building by means of lamella panels.
21 m long pipeline bridge, in steel lattice formwork in one piece. Weight approx. 15 t including the pipes. Installation and switchover of all supply lines was completed within 3 days.
Floor space 70 m x 40 m, crane track 70 m long, two crane bridges each designed to bear 8 tonnes, total weight of steel construction 94 t, production documents were provided by the customer. From the placement of the order until the building was occupied only took 10 weeks.