Cookie Consent by FreePrivacyPolicy.com

Apparatus and tank construction

Zurück

Bitumen flare

Extensive preparatory work was completed in the plant Aschaffenburg: stress relief annealing, corrosion protection and the pre-assembly of the ladders and platforms. After this, the flame elements  were transported on heavy goods lorries to the refinery grounds, where the cowl parts were joined together 
with X-ray-proof assembly joints and the filter tanks were levelled out. The upper part of the cowl is placed onto the filter tank and the head of the flare burner is mounted. Once the remaining ladders and platforms have been mounted, the gas flare is ready for use in the refinery. 

APPARATUS AND TANK CONSTRUCTION

FROM VACUUM TO HIGH PRESSURE

Bick + Letzel GmbH can cover the wide range of technical applications in the apparatus and tank construction field, be it vacuum or high-pressure projects. Laboratory and large technical applications for various media can also be realised.

For many years we have been manufacturing complex tank models, even in stainless steel, tube-bundle heat exchangers for cooling and heating systems, and various assembly apparatus for pressurisation, filter and measuring systems for our customers.

Of course, we can also meet even the strictest of your quality requirements as proven by our certificates. All welding procedures can be carried out in compliance with European standards or the ASME.

Our qualified, flexible and motivated team can offer you efficient and fast solutions at any time.

 

APPARATUS CONSTRUCTION

Facts

  • Tanks that comply to the Pressure Equipment Directive 97/23/EC#
  • AD 2000 Regulations (Instructions HP0)
  • ASME approval
  • Lading port
  • 450 t crane
  • Large hall
  • WHG (Water Resources Act)